Skip to content

Contact centre peak readiness

This runbook is the hands-on companion to How to load test a contact centre before a peak event. The blog post explains why and how to plan. This page gives you the checklist, the steps and the criteria to sign off.

MaxoPerf tests the web-facing and API layers of a contact centre. It does not generate SIP or voice calls. The docs list no SIP support, so the voice layer needs a dedicated voice tool such as the open-source SIPp, or your vendor’s approved test process.

  • Interval history (15 or 30 minutes) for a comparable event, per channel.
  • Average handle time per channel and interval.
  • Offered load in Erlangs: arrivals per hour × AHT in seconds ÷ 3,600. Staffing must exceed it.
  • Concurrent calls: arrival rate × seconds in IVR, queue and talk. This must fit inside your trunk channels and IVR ports.
  • Retry factor from past events for busy signals and dropped calls.
  • Written approval from your carrier and CCaaS vendor for any synthetic voice or chat volume. Check your provider’s policy.
  • A test environment and production-scale synthetic customer data. No real customer records.
  • Mocks for every third party you must not hit.
  • Abort criteria signed off by the incident lead.
LayerTest withOwner sign-off
SIP trunks, concurrent-call capacityVoice generator or carrier testTelephony lead
IVR, speech self-service, payment IVRVoice tool or vendor testIVR owner
ACD routing and queuesVendor test or voice toolPlatform owner
CTI linkVendor test, plus desktop browser testPlatform owner
Agent desktop (web app)Browser testsDesktop team
CRM and knowledge-base APIsAPI load testCRM owner
Chat, messaging, botsAPI or WebSocket load testDigital team
Callback schedulingAPI load testPlatform owner
Web self-service, status pageHTTP or browser load testWeb team
Identity and authenticationAPI load testSecurity lead
Third parties (payment, carrier, SMS)Virtual services instead of the real serviceIntegration owner
  1. Model the peak. Build a table of calls, chats, web sessions and callback requests per interval, including the spike at the announcement minute. See capacity planning and traffic modeling for turning history into a target.
  2. Script the agent desktop. Write a browser test that logs in, takes a screen pop, searches the knowledge base and saves notes. Run it in browser tests so you get video, HAR and step timing.
  3. Script the APIs behind it. Call the CRM, knowledge-base, chat and callback endpoints at the rate the desktop and channels produce. Use a staged ramp or a fixed request rate.
  4. Add the burst cases. Model the agent login storm at shift start and the queue-drain burst, when many agents receive a call within seconds.
  5. Test the overflow. Drive web self-service, the status page and callback booking at the volume the full phone queue would push to them.
  6. Bind the mocks. Create virtual services for payment, identity and SMS providers and bind them to the test. Give them realistic latency and error behaviour.
  7. Reach internal systems. If the CRM or desktop back ends are not public, generate load from a private Outpost.
  8. Run the voice test separately. Use your voice tool or the vendor’s process in the agreed window, targeting the concurrent-call figure including retries.
  9. Set failure criteria on every test so each run ends with a verdict (failure criteria).
  10. Rehearse and compare. Rerun after each fix and use run comparison against the baseline. Keep a nightly schedule running until the freeze.
TypeShapeLayers
BaselineNormal busy day, shortAll web and API layers
PeakForecast plateau plus headroomDesktop, CRM, chat, self-service
SpikeJump to the announcement-minute rateSelf-service, callback, chat, CRM
SoakFull event day, including shift changesDesktop, CRM, auth
FailoverRemove a node, trunk or dependency under loadWhatever you break safely, with owner agreement

See spike and stress and soak and stability for how to read those runs.

WhenMilestone
T-8 weeksLayer map, owners, voice and vendor approvals requested
T-7 weeksPeak model reviewed by workforce management
T-6 weeksEnvironment, data and mocks ready
T-5 weeksScripts built, baselines recorded
T-4 weeksFirst peak run on web layers, approved voice test
T-3 weeksFix and retest cycles
T-2 weeksSpike and failover tests
T-1 weekFull-day dress rehearsal with the war-room staffed
T-2 daysChange freeze, rota confirmed
Event dayWar-room live, thresholds watched
T+1 weekDebrief, model updated

Treat these as a starting point. Set your own with the incident lead, and record who agreed them.

SignalAmberRed (stop or escalate)
Overall error rate (web and API)> 1 % for 3 min> 5 % for 2 min
Agent desktop screen pop, p95> 3 s> 8 s
CRM lookup, p95> 800 ms> 2 s
Self-service page, p95> 2 s> 5 s
Callback booking errors> 1 %> 5 %
Test traffic reaching a real third partyAnyStop the test
Test traffic reaching real customersAnyStop the test

The numbers are illustrative. Derive yours from your own baseline and what agents work with. The war-room and runbook page covers the roles and the escalation flow.

SymptomCauseFix
Busy signals appear far below targetTrunk channels or IVR ports are the limitRecheck the concurrent-call sum, including retries
Desktop passes, agents report slownessLogin storm and queue-drain burst missingAdd both to the desktop test
Test passes, event fails on self-serviceEmail click-through traffic missingAdd it on top of the overflow load
Results beat productionMock answers faster than the real serviceSet production-like latency and errors on the virtual service
Vendor halts the testNotice or approval missingAgree a window in writing and rerun
Run ends with no verdictNo failure criteria on the testAdd criteria and rerun