Contact centre peak readiness
This runbook is the hands-on companion to How to load test a contact centre before a peak event. The blog post explains why and how to plan. This page gives you the checklist, the steps and the criteria to sign off.
MaxoPerf tests the web-facing and API layers of a contact centre. It does not generate SIP or voice calls. The docs list no SIP support, so the voice layer needs a dedicated voice tool such as the open-source SIPp, or your vendor’s approved test process.
Prerequisites
Section titled “Prerequisites”- Interval history (15 or 30 minutes) for a comparable event, per channel.
- Average handle time per channel and interval.
- Offered load in Erlangs: arrivals per hour × AHT in seconds ÷ 3,600. Staffing must exceed it.
- Concurrent calls: arrival rate × seconds in IVR, queue and talk. This must fit inside your trunk channels and IVR ports.
- Retry factor from past events for busy signals and dropped calls.
- Written approval from your carrier and CCaaS vendor for any synthetic voice or chat volume. Check your provider’s policy.
- A test environment and production-scale synthetic customer data. No real customer records.
- Mocks for every third party you must not hit.
- Abort criteria signed off by the incident lead.
Layer map
Section titled “Layer map”| Layer | Test with | Owner sign-off |
|---|---|---|
| SIP trunks, concurrent-call capacity | Voice generator or carrier test | Telephony lead |
| IVR, speech self-service, payment IVR | Voice tool or vendor test | IVR owner |
| ACD routing and queues | Vendor test or voice tool | Platform owner |
| CTI link | Vendor test, plus desktop browser test | Platform owner |
| Agent desktop (web app) | Browser tests | Desktop team |
| CRM and knowledge-base APIs | API load test | CRM owner |
| Chat, messaging, bots | API or WebSocket load test | Digital team |
| Callback scheduling | API load test | Platform owner |
| Web self-service, status page | HTTP or browser load test | Web team |
| Identity and authentication | API load test | Security lead |
| Third parties (payment, carrier, SMS) | Virtual services instead of the real service | Integration owner |
- Model the peak. Build a table of calls, chats, web sessions and callback requests per interval, including the spike at the announcement minute. See capacity planning and traffic modeling for turning history into a target.
- Script the agent desktop. Write a browser test that logs in, takes a screen pop, searches the knowledge base and saves notes. Run it in browser tests so you get video, HAR and step timing.
- Script the APIs behind it. Call the CRM, knowledge-base, chat and callback endpoints at the rate the desktop and channels produce. Use a staged ramp or a fixed request rate.
- Add the burst cases. Model the agent login storm at shift start and the queue-drain burst, when many agents receive a call within seconds.
- Test the overflow. Drive web self-service, the status page and callback booking at the volume the full phone queue would push to them.
- Bind the mocks. Create virtual services for payment, identity and SMS providers and bind them to the test. Give them realistic latency and error behaviour.
- Reach internal systems. If the CRM or desktop back ends are not public, generate load from a private Outpost.
- Run the voice test separately. Use your voice tool or the vendor’s process in the agreed window, targeting the concurrent-call figure including retries.
- Set failure criteria on every test so each run ends with a verdict (failure criteria).
- Rehearse and compare. Rerun after each fix and use run comparison against the baseline. Keep a nightly schedule running until the freeze.
Test types
Section titled “Test types”| Type | Shape | Layers |
|---|---|---|
| Baseline | Normal busy day, short | All web and API layers |
| Peak | Forecast plateau plus headroom | Desktop, CRM, chat, self-service |
| Spike | Jump to the announcement-minute rate | Self-service, callback, chat, CRM |
| Soak | Full event day, including shift changes | Desktop, CRM, auth |
| Failover | Remove a node, trunk or dependency under load | Whatever you break safely, with owner agreement |
See spike and stress and soak and stability for how to read those runs.
T-minus timeline
Section titled “T-minus timeline”| When | Milestone |
|---|---|
| T-8 weeks | Layer map, owners, voice and vendor approvals requested |
| T-7 weeks | Peak model reviewed by workforce management |
| T-6 weeks | Environment, data and mocks ready |
| T-5 weeks | Scripts built, baselines recorded |
| T-4 weeks | First peak run on web layers, approved voice test |
| T-3 weeks | Fix and retest cycles |
| T-2 weeks | Spike and failover tests |
| T-1 week | Full-day dress rehearsal with the war-room staffed |
| T-2 days | Change freeze, rota confirmed |
| Event day | War-room live, thresholds watched |
| T+1 week | Debrief, model updated |
Example pass and abort criteria
Section titled “Example pass and abort criteria”Treat these as a starting point. Set your own with the incident lead, and record who agreed them.
| Signal | Amber | Red (stop or escalate) |
|---|---|---|
| Overall error rate (web and API) | > 1 % for 3 min | > 5 % for 2 min |
| Agent desktop screen pop, p95 | > 3 s | > 8 s |
| CRM lookup, p95 | > 800 ms | > 2 s |
| Self-service page, p95 | > 2 s | > 5 s |
| Callback booking errors | > 1 % | > 5 % |
| Test traffic reaching a real third party | Any | Stop the test |
| Test traffic reaching real customers | Any | Stop the test |
The numbers are illustrative. Derive yours from your own baseline and what agents work with. The war-room and runbook page covers the roles and the escalation flow.
Troubleshooting
Section titled “Troubleshooting”| Symptom | Cause | Fix |
|---|---|---|
| Busy signals appear far below target | Trunk channels or IVR ports are the limit | Recheck the concurrent-call sum, including retries |
| Desktop passes, agents report slowness | Login storm and queue-drain burst missing | Add both to the desktop test |
| Test passes, event fails on self-service | Email click-through traffic missing | Add it on top of the overflow load |
| Results beat production | Mock answers faster than the real service | Set production-like latency and errors on the virtual service |
| Vendor halts the test | Notice or approval missing | Agree a window in writing and rerun |
| Run ends with no verdict | No failure criteria on the test | Add criteria and rerun |
Where to go next
Section titled “Where to go next”- How to load test a contact centre before a peak event: the narrative plan and a worked example with hypothetical numbers.
- Third-party and payment dependencies: modelling what you must not hit.
- Realistic peak load profiles: turning the model into a load profile.